Home/Outboards/Johnson Evinrude/Routine Inspections

Routine InspectionsOutboards1995 Johnson/Evinrude 2-cylinder 40-55HP motors

Power Tilt and Trim routine inspections

  1. Check reservoir fluid level at least once per season or every 100 operating hours. System capacity is approximately 11.7 fl. oz. (345 mil):
    • Tilt the motor and engage the trail lock levers.
    • Support the engine's weight with a suitable hoist.
    • Remove the fill plug.
    • Add OMC Power Trim/Tilt and Power Steering Fluid or GM Dexron II, as needed, to bring its level to the bottom of the fill plug threads.
    • Install the fill plug and torque to 45-55 in. Ibs. (5-6 Nm).
    • Disengage the trail lock levers and the hoist.
    • Cycle the unit at least 5 complete cycles to purge all air from the system. When cycling the unit, hold the trim switch ON an additional 5 to 10 seconds after the unit reaches the end of its travel before activating the switch in the opposite direction.
  2. Check the manual release valve with a torque wrench. The valve must be torqued to 45-55 in. Ibs. (5-6 Nm).
  3. Check for external signs of fluid leakage. Correct causes as necessary.
  4. Inspect the stern brackets for binding with the swivel bracket in the thrust rod area. Re-torque the tilt tube nuts as follows:
    • Tighten the tilt tube nuts to a torque of 40-45 ft. Ibs. (54-60 Nm).
    • Loosen one nut 1/8 to 1/4 turn after torquing.
  5. Check the battery's state of charge. Refer to Battery Specifications, Electrical Section.
  6. Power steering fluid fillin-up

    Updated on: Monday, November 16, 2020

×

Navigation